Friday 16 July 2010

Argie 10 kits to Durban

Ready for packing,two sets of Argie 10 kits,plus The Poplar wood is machined to size and packed in plastic tube wrapping to ensure it will transport in the same condition we packed it.
Wrapped and steel band strapped,the six sheets of five ply ockume marine plys are inside the blue pallet.
We shipped out two Argie 10 kits to Eddie in Durban yesterday,there will be a saving on both packing and delivery,it will be good to watch Eddie and his brothers progress as they both build their boats,one design dinghy racing will never be closer!

No comments:

Post a Comment