We have done a number of these,its a setting up process that really does need a long and quite straight work bench.In the case of the Argie 15 you need six meters of bench.
We machine the two halves to accept a standard 6mm bolt rope with an entry slot just above the boom.The main section of the mast is hollow,the wood being removed with a very large 32mm router bit that was specially made for the job.
How hard can this be? not too sure,its was all a very common process some decades back.
RMcB
We machine the two halves to accept a standard 6mm bolt rope with an entry slot just above the boom.The main section of the mast is hollow,the wood being removed with a very large 32mm router bit that was specially made for the job.
How hard can this be? not too sure,its was all a very common process some decades back.
RMcB