Sunday, 4 December 2011

KD860 catamaran loading

This was ready for collection once the glass,micro balloons and fused silica arrived,the trucking company were taking good care of loading,thats 31 items,plys,wood,epoxy,all the materials required to build one boat.This materials pack will go by road to the Johannesburg area,normally a three day period,we can ship world wide as well,plans are direct from the designer at http://www.ikarus342000.com/KD860pic.htm

No comments:

Post a Comment