Monday, 15 December 2008
First Touch,also the first cant keel design yacht launched in South Africa
It was this boat that we were able to develop our Didi Mini Transat interiors from,Warlock was done by hand,set out,then cut to size with a power hand held jig saw,Running With Scissors was done as templates,then CNC cut,this took the dry fitting time down from four and a half days to a mean four and a half hours,its this kind of extra we supply as standard, that makes our kits worth considering,we built this kit too.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment