Wednesday, 25 June 2008
Inside our factory
An Argie 15 clear oregon pine boom kit,being hollowed with a 32mm diameter tungsten router bit.
Inside our factory,the 16mtrs long white mast is in for a service and repaint,it will be reassembled using Tef-Gel paste.
Many may wonder where we do the work,we have what I think is a nice factory,its about 275 square meters,plus the offices,part of the factory floor space is pure storage to our stocks of Superform bending and marine plys,the rest we use as work stations,which includes a rip saw,two band saws,radial arm cut off saw,spindle,thicknesser,two compressors,plus the usual hand and power tools,its a set up that is very flexible.At this time we have a set of Clear Oregon Pine stringers to machine for a Wharram Tiki 38 and today ran some timbers for an Argie 15 mast and boom,also in Oregon Pine,the picture on this blog shows the two halfs of the Argie 15 boom,hollowed out and ready to ship with the rest of the boats kit.
Roy
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment