Tuesday, 3 July 2012

A new Cape Henry 21 boat build in six months

It sure seems that way as we supplied a local buyer with a plywood kit set back in November 2011, with things not really starting untill the next month and then a holiday break of about a month, we see a build period of the six months I mentioned.


This looks like a very quick boat to me, she will outsail many craft much larger than her 21 feet I think.



This Cape Henry 21 will have a small inboard diesel engine installed, normally they use a 4 stroke petrol outboard in a well inside the aft end of the cockpit.


With our kits being assembled locally by a specialist boat builder, we can now offer fully built boats to order.

We have another Cape Henry 21 ply pack kit being prepared right now, we are also supplying the drop keel and stainless steel deck gear,  it will ship to Seattle, USA.

Roy